<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0"><channel><title><![CDATA[Helios Renewable Energy Australia]]></title><description><![CDATA[Helios Renewable Energy Australia]]></description><link>https://www.heliosrenewable.com.au/case-studies</link><generator>RSS for Node</generator><lastBuildDate>Fri, 17 Apr 2026 10:54:46 GMT</lastBuildDate><atom:link href="https://www.heliosrenewable.com.au/blog-feed.xml" rel="self" type="application/rss+xml"/><item><title><![CDATA[BUNBURY OUTER RING ROAD – DEPARTMENT OF FIRE &#38; EMERGENCY SERVICES FIREWATER TANK FILL POINT]]></title><description><![CDATA[Installation – May 2025 As part of the construction works for the Bunbury Outer Ring Road Project an alternative and reliable power supply was required due to constraints with power reticulation to the semi-rural location in South-West Western Australia. Helios Renewable were able to size and supply a HPS20 unit to power the Department of Fire &#38; Emergency Services (DFES) fire water tank site. The HPS20 powers an extraction bore pump and standpipe discharge pump. The HPS will provide battery...]]></description><link>https://www.heliosrenewable.com.au/post/bunbury-outer-ring-road-department-of-fire-emergency-services-firewater-tank-fill-point</link><guid isPermaLink="false">69b9bb005303a105b06caf31</guid><pubDate>Tue, 17 Mar 2026 20:36:13 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/4ddeb1_7e4948d315e043ddb449362274fd706a~mv2.png/v1/fit/w_907,h_682,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>HELIOS RENEWABLE ENERGY</dc:creator></item><item><title><![CDATA[RIO TINTO – ROSELLA &#38; EMU RAIL RESPONSE HUBS]]></title><description><![CDATA[Installation – Dec 2024 &#38; March 2025 Helios Renewable supplied two 45kVa Hybrid Power System (HPS) units which provide battery power to the two separate Rio Tinto Rail Response Hubs facilities, with battery charging via the 8kWP solar arrays and internal generator, also supplied was 30kVa standby generator. The HPS45 units were integrated early into the design to provide a seamless interface into the facility. HPS45 deployed at Rio Tinto's Rail Response Hub in Rosella &#38; Emu, WA, powering a...]]></description><link>https://www.heliosrenewable.com.au/post/rio-tinto-rosella-emu-rail-response-hubs</link><guid isPermaLink="false">69b9ba443219c84449937cf6</guid><pubDate>Tue, 17 Mar 2026 20:34:49 GMT</pubDate><enclosure url="https://static.wixstatic.com/media/4ddeb1_cd991a693cdc4bd683780e2d88792688~mv2.png/v1/fit/w_723,h_721,al_c,q_80/file.png" length="0" type="image/png"/><dc:creator>HELIOS RENEWABLE ENERGY</dc:creator></item></channel></rss>